Detailed Engineering - Factory Acceptance Test

The detailed engineering starts immediately after the FDS approval.

At the end of this phase, the project data, documents and drawings are compiled in a “Construction Manual” which will be submitted to the client for review and approval.

Factory Acceptance Test:

Target Engineering prepares all the procedures for the Factory Acceptance Test “FAT” as well as the necessary tools for conducting the test.

Our standard FAT procedure includes hardware testing and complete functional check for the system.